Joint Real-Time Scheduling Methods for Deterministic Industrial Field/Backhaul Networks
draft-wang-detnet-joint-scheduling-03
Document | Type |
Expired Internet-Draft
(individual)
Expired & archived
|
|
---|---|---|---|
Authors | Heng Wang , Ping Wang , Hang Yang | ||
Last updated | 2018-11-15 (Latest revision 2018-05-14) | ||
RFC stream | (None) | ||
Intended RFC status | (None) | ||
Formats | |||
Stream | Stream state | (No stream defined) | |
Consensus boilerplate | Unknown | ||
RFC Editor Note | (None) | ||
IESG | IESG state | Expired | |
Telechat date | (None) | ||
Responsible AD | (None) | ||
Send notices to | (None) |
This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:
Abstract
In industrial field/backhaul networks, joint real-time scheduling method is important to make end-to-end flows meet their deadline. This document proposes four joint scheduling methods, and they involve four scenarios: time-slotted industrial backhaul network, regarding industrial backhaul network as a black box system, ignoring delay of industrial backhaul and establishing latency model of industrial backhaul network.
Authors
(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)