Telechat Review of draft-ietf-v6ops-conditional-ras-05
review-ietf-v6ops-conditional-ras-05-genart-telechat-haddad-2018-08-02-00

Request Review of draft-ietf-v6ops-conditional-ras
Requested rev. no specific revision (document currently at 08)
Type Telechat Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2018-07-31
Requested 2018-07-04
Draft last updated 2018-08-02
Completed reviews Rtgdir Last Call review of -04 by Ravi Singh (diff)
Genart Last Call review of -04 by Wassim Haddad (diff)
Opsdir Last Call review of -04 by Sheng Jiang (diff)
Genart Telechat review of -05 by Wassim Haddad (diff)
Tsvart Telechat review of -05 by Yoshifumi Nishida (diff)
Opsdir Telechat review of -05 by Sheng Jiang (diff)
Assignment Reviewer Wassim Haddad
State Completed
Review review-ietf-v6ops-conditional-ras-05-genart-telechat-haddad-2018-08-02
Reviewed rev. 05 (document currently at 08)
Review result Ready
Review completed: 2018-08-02

Review
review-ietf-v6ops-conditional-ras-05-genart-telechat-haddad-2018-08-02

I am the assigned Gen-ART reviewer for this draft. The General Area Review Team (Gen-ART) reviews all IETF documents being processed by the IESG for the IETF Chair. Please treat these comments just like any other last call comments.

For more information, please see the FAQ at: https://trac.ietf.org/trac/gen/wiki/GenArtfaq

Document: draft-ietf-v6ops-conditional-ras-05
Reviewer:  Wassim Haddad
Review Date: 05 July 2018
IETF LC End Date: 21 May 2018 
IESG Telechat Date: 02 August 2018

Summary:  This draft is ready for publication as Informational RFC 

- Major Issues: None

- Minor Issues: None


Regards,

Wassim H.