Skip to main content

Early Review of draft-ietf-lime-yang-connection-oriented-oam-model-03
review-ietf-lime-yang-connection-oriented-oam-model-03-yangdoctors-early-moberg-2018-01-22-00

Request Review of draft-ietf-lime-yang-connection-oriented-oam-model-01
Requested revision 01 (document currently at 07)
Type Early Review
Team YANG Doctors (yangdoctors)
Deadline 2018-01-10
Requested 2017-12-13
Requested by Mehmet Ersue
Authors Deepak Kumar , Qin Wu , Zitao Wang
I-D last updated 2018-01-22
Completed reviews Yangdoctors Early review of -03 by Carl Moberg (diff)
Opsdir Last Call review of -05 by Joe Clarke (diff)
Genart Last Call review of -05 by Paul Kyzivat (diff)
Secdir Last Call review of -05 by Sandra L. Murphy (diff)
Comments
Carl Moberg reviewed earlier draft-ietf-lime-yang-oam-model, which is now replaced by draft-ietf-lime-yang-connection-oriented-oam-model. Carl should review again.
Assignment Reviewer Carl Moberg
State Completed
Request Early review on draft-ietf-lime-yang-connection-oriented-oam-model by YANG Doctors Assigned
Reviewed revision 03 (document currently at 07)
Result On the Right Track
Completed 2018-01-22
review-ietf-lime-yang-connection-oriented-oam-model-03-yangdoctors-early-moberg-2018-01-22-00
Error; cannot read
(/assets/ietfdata/doc/review/review-ietf-lime-yang-connection-oriented-oam-model-03-yangdoctors-early-moberg-2018-01-22.txt)