Review request
draft-ietf-bess-nsh-bgp-control-plane

Request Review of draft-ietf-bess-nsh-bgp-control-plane
Requested rev. no specific revision (document currently at 13)
Type Last Call Review
Team Transport Area Review Team (tsvart)
Deadline 2019-12-13
Requested 2019-11-29
Authors Adrian Farrel, John Drake, Eric Rosen, Jim Uttaro, Luay Jalil
WG chairs Stephane Litkowski, Matthew Bocci
Draft last updated 2019-12-19
Completed reviews Tsvart Last Call review of -13 by Olivier Bonaventure
Opsdir Last Call review of -13 by Sheng Jiang
Secdir Last Call review of -13 by Scott Kelly
Genart Last Call review of -12 by Brian Carpenter (diff)
Assignment Reviewer Olivier Bonaventure
State Completed
Review review-ietf-bess-nsh-bgp-control-plane-13-tsvart-lc-bonaventure-2019-12-17
Posted at https://mailarchive.ietf.org/arch/msg/tsv-art/M_sUBRzilWqmxNrsULaxSFqZCUo
Reviewed rev. 13
Review result Ready
Review completed: 2019-12-17

History

Date By Description
2019-12-17 Olivier Bonaventure Request for Last Call review by TSVART Completed: Ready. Reviewer: Olivier Bonaventure.
2019-12-17 Olivier Bonaventure Assignment for Olivier Bonaventure accepted