Skip to main content

Concluded WG P. Internet Protocol (pip)

Group history

Date By Action
1994-02-17 (System) Concluded group
1993-03-03 (System) Changed milestone "Post as an Internet-Draft the modifications to DNS for PIP, the Address assignment in PIP, and the PIP transition strategy.", resolved as "Done"
1992-11-30 (System) Changed milestone "Presentation and review of the PIP specification by the IESG.  If acceptable, the first Working Group meeting will be held.", resolved as "Done"
1992-09-30 (System)
Changed milestone "Post as an Internet-Draft a description of the PIP Packet Format and Forwarding Engine, the PIP Control Message Protocol (PCMP), the PIP Host …
Changed milestone "Post as an Internet-Draft a description of the PIP Packet Format and Forwarding Engine, the PIP Control Message Protocol (PCMP), the PIP Host Interface Message Protocol, and the PIP MTU Discovery Protocol.", resolved as "Done"
1992-09-01 (System) Changed milestone "Review and approval of the Charter for the PIP Working Group.", resolved as "Done"
1992-08-31 (System) Started group
1992-08-28 (System) Proposed group