Skip to main content

Last Call Review of draft-ietf-payload-flexible-fec-scheme-16
review-ietf-payload-flexible-fec-scheme-16-tsvart-lc-aboba-2019-02-04-00

Request Review of draft-ietf-payload-flexible-fec-scheme
Requested revision No specific revision (document currently at 20)
Type Last Call Review
Team Transport Area Review Team (tsvart)
Deadline 2019-02-01
Requested 2019-01-18
Authors Mo Zanaty , Varun Singh , Ali C. Begen , Giridhar Mandyam
I-D last updated 2019-02-04
Completed reviews Secdir Last Call review of -16 by Radia Perlman (diff)
Genart Last Call review of -16 by Meral Shirazipour (diff)
Tsvart Last Call review of -16 by Dr. Bernard D. Aboba (diff)
Secdir Telechat review of -17 by Radia Perlman (diff)
Assignment Reviewer Dr. Bernard D. Aboba
State Completed
Request Last Call review on draft-ietf-payload-flexible-fec-scheme by Transport Area Review Team Assigned
Reviewed revision 16 (document currently at 20)
Result Ready w/issues
Completed 2019-02-04
review-ietf-payload-flexible-fec-scheme-16-tsvart-lc-aboba-2019-02-04-00
Error; cannot read
(/assets/ietfdata/doc/review/review-ietf-payload-flexible-fec-scheme-16-tsvart-lc-aboba-2019-02-04.txt)