Skip to main content

Last Call Review of draft-ietf-idr-tunnel-encaps-19
review-ietf-idr-tunnel-encaps-19-tsvart-lc-trammell-2020-09-28-00

Request Review of draft-ietf-idr-tunnel-encaps
Requested revision No specific revision (document currently at 22)
Type Last Call Review
Team Transport Area Review Team (tsvart)
Deadline 2020-10-01
Requested 2020-09-17
Authors Keyur Patel , Gunter Van de Velde , Srihari R. Sangli , John Scudder
I-D last updated 2020-09-28
Completed reviews Rtgdir Last Call review of -19 by Harish Sitaraman (diff)
Genart Last Call review of -19 by Gyan Mishra (diff)
Tsvart Last Call review of -19 by Brian Trammell (diff)
Opsdir Last Call review of -19 by Jouni Korhonen (diff)
Secdir Last Call review of -20 by Scott G. Kelly (diff)
Assignment Reviewer Brian Trammell
State Completed
Request Last Call review on draft-ietf-idr-tunnel-encaps by Transport Area Review Team Assigned
Posted at https://mailarchive.ietf.org/arch/msg/tsv-art/_rFnsV4wZuguChKlgQJrl9NTGeQ
Reviewed revision 19 (document currently at 22)
Result Ready w/issues
Completed 2020-09-28
review-ietf-idr-tunnel-encaps-19-tsvart-lc-trammell-2020-09-28-00
Error; cannot read
(/assets/ietfdata/doc/review/review-ietf-idr-tunnel-encaps-19-tsvart-lc-trammell-2020-09-28.txt)