Skip to main content

Wind Park requirements for Detnet
draft-vilajosana-detnet-windfarm-usecase-00

Document Type Expired Internet-Draft (individual)
Expired & archived
Authors Xavier Vilajosana , Toktam Mahmoodi , Spiros Spirou, Petra Vizarreta
Last updated 2017-01-08 (Latest revision 2016-07-07)
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

This document analyses the use case requirements for deterministic flows in a wind park network. It inlcudes the intra-domain and inter-domain requirements.

Authors

Xavier Vilajosana
Toktam Mahmoodi
Spiros Spirou
Petra Vizarreta

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)