Skip to main content

Pluggable Stream Scheduling for the Stream Control Transmission Protocol
draft-tuexen-tsvwg-sctp-scheduling-00

Document Type Expired Internet-Draft (individual)
Expired & archived
Authors Robin Seggelmann , Randall R. Stewart , Michael Tüxen
Last updated 2013-05-23 (Latest revision 2012-11-19)
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

This document describes pluggable stream scheduling to change the scheduling behavior of the Stream Control Transmission Protocol (SCTP). Pluggable stream scheduling allows to use different scheduling algorithms to optimize SCTP's behavior in different scenarios.

Authors

Robin Seggelmann
Randall R. Stewart
Michael Tüxen

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)