Skip to main content

5G Wireline Transport over PPP
draft-padebettu-5g-wireline-transport-over-ppp-00

Document Type Expired Internet-Draft (individual)
Expired & archived
Author Venkatesh Padebettu
Last updated 2021-03-08 (Latest revision 2020-08-30)
RFC stream (None)
Intended RFC status (None)
Formats
Stream Stream state (No stream defined)
Consensus boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date (None)
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft is available in these formats:

Abstract

To support connecting 5G residential gateways(5G-RG) to 5G Core (5GC) over wireline access, the control packets and data packets of the 5G- RG should be transported over the wireline access network (W-AN) to Access Gateway Function(W-AGF). The Point-to-Point Protocol (PPP) [RFC1661] provides a standard method for transporting multi-protocol datagrams over point-to-point links. PPP defines an extensible Link Control Protocol, and proposes a family of Network Control Protocols for establishing and configuring different network-layer protocols. This document defines the 5G Wireline Control Protocol(5WCP) for establishing and configuring the 5G Wireline Data protocol(5W Data) over PPP for Wireline Access for 5G Networks. The method inherits multiplexing of traffic for multiple 5G-RGs per VLAN from PPPoE [RFC2516] and defines multiplexing multiple PDU Sessions per 5G-RG.

Authors

Venkatesh Padebettu

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)