Review request
draft-ietf-ccamp-otn-tunnel-model
Request | Review of | draft-ietf-ccamp-otn-tunnel-model-11 |
---|---|---|
Requested revision | 11 (document currently at 20) | |
Type | Last Call Review | |
Team | YANG Doctors (yangdoctors) | |
Deadline | 2020-10-16 | |
Requested | 2020-09-25 | |
Requested by | Daniele Ceccarelli | |
Authors | Haomian Zheng , Italo Busi , Sergio Belotti , Victor Lopez , Yunbin Xu | |
WG chairs | Fatai Zhang , Luis M. Contreras , Daniele Ceccarelli | |
I-D last updated | 2023-11-24 | |
IESG document state | I-D Exists | |
Completed reviews |
Yangdoctors Last Call review of -11
by Radek Krejčí
(diff)
|
|
Comments |
Would it be possible to have a joint review with: https://datatracker.ietf.org/doc/html/draft-ietf-ccamp-otn-topo-yang-11 ? Both document specify YANG models for OTN networks, one is about topology and the other one about tunnels. I'll put the same request while asking for the review of the topology model. Thanks! |
|
Assignment | Reviewer | Radek Krejčí |
State | Completed | |
Review |
review-ietf-ccamp-otn-tunnel-model-11-yangdoctors-lc-krejci-2020-10-16
|
|
Posted at | https://mailarchive.ietf.org/arch/msg/yang-doctors/CFoAjnS3XqdF4frVetuKe_83iVk | |
Reviewed revision | 11 (document currently at 20) | |
Result | Ready w/issues | |
Completed | 2020-10-16 |
History
Date | By | Description |
---|---|---|
2020-10-16 | Radek Krejčí | Request for Last Call review by YANGDOCTORS Completed: Ready with Issues. Reviewer: Radek Krejčí. |
2020-10-13 | Radek Krejčí | Assignment for Radek Krejčí accepted |
2020-09-26 | Mehmet Ersue | Request for Last Call review by YANGDOCTORS is assigned to Radek Krejčí |
2020-09-25 | Daniele Ceccarelli | Requested Last Call review by YANGDOCTORS |