Skip to main content

Review request
draft-ietf-ccamp-otn-tunnel-model

Request Review of draft-ietf-ccamp-otn-tunnel-model-11
Requested revision 11 (document currently at 20)
Type Last Call Review
Team YANG Doctors (yangdoctors)
Deadline 2020-10-16
Requested 2020-09-25
Requested by Daniele Ceccarelli
Authors Haomian Zheng , Italo Busi , Sergio Belotti , Victor Lopez , Yunbin Xu
WG chairs Fatai Zhang , Luis M. Contreras , Daniele Ceccarelli
I-D last updated 2023-11-24
IESG document state I-D Exists
Completed reviews Yangdoctors Last Call review of -11 by Radek Krejčí (diff)
Comments
Would it be possible to have a joint review with: https://datatracker.ietf.org/doc/html/draft-ietf-ccamp-otn-topo-yang-11 ?
Both document specify YANG models for OTN networks, one is about topology and the other one about tunnels.
I'll put the same request while asking for the review of the topology model.
Thanks!
Assignment Reviewer Radek Krejčí
State Completed
Review review-ietf-ccamp-otn-tunnel-model-11-yangdoctors-lc-krejci-2020-10-16
Posted at https://mailarchive.ietf.org/arch/msg/yang-doctors/CFoAjnS3XqdF4frVetuKe_83iVk
Reviewed revision 11 (document currently at 20)
Result Ready w/issues
Completed 2020-10-16

History

Date By Description
2020-10-16 Radek Krejčí Request for Last Call review by YANGDOCTORS Completed: Ready with Issues. Reviewer: Radek Krejčí.
2020-10-13 Radek Krejčí Assignment for Radek Krejčí accepted
2020-09-26 Mehmet Ersue Request for Last Call review by YANGDOCTORS is assigned to Radek Krejčí
2020-09-25 Daniele Ceccarelli Requested Last Call review by YANGDOCTORS