Skip to main content

Review request
draft-ietf-bess-nsh-bgp-control-plane

Request Review of draft-ietf-bess-nsh-bgp-control-plane
Requested revision No specific revision (document currently at 18)
Type Last Call Review
Team General Area Review Team (Gen-ART) (genart)
Deadline 2019-12-13
Requested 2019-11-29
Authors Adrian Farrel , John Drake , Eric C. Rosen , Jim Uttaro , Luay Jalil
WG chairs Matthew Bocci , Stephane Litkowski , Zhaohui (Jeffrey) Zhang
I-D last updated 2021-06-08
IESG document state Became RFC 9015 (Proposed Standard)
Completed reviews Rtgdir Last Call review of -13 by Ravi Singh (diff)
Tsvart Last Call review of -13 by Olivier Bonaventure (diff)
Opsdir Last Call review of -13 by Sheng Jiang (diff)
Secdir Last Call review of -13 by Scott G. Kelly (diff)
Genart Last Call review of -12 by Brian E. Carpenter (diff)
Assignment Reviewer Brian E. Carpenter
State Completed
Review review-ietf-bess-nsh-bgp-control-plane-12-genart-lc-carpenter-2019-12-09
Posted at https://mailarchive.ietf.org/arch/msg/gen-art/x56AXHv1koysQ-AiicDeTGdeMXY
Reviewed revision 12 (document currently at 18)
Result Ready w/issues
Completed 2019-12-09

History

Date By Description
2019-12-09 Brian E. Carpenter Request for Last Call review by GENART Completed: Ready with Issues. Reviewer: Brian Carpenter.
2019-12-09 Brian E. Carpenter Assignment for Brian Carpenter accepted