Control Plane and User Plane Separated BNG Deployment Model
draft-cuspdt-rtgwg-cu-separation-bng-deployment-02

Document Type Expired Internet-Draft (individual)
Last updated 2019-06-15 (latest revision 2018-12-12)
Stream (None)
Intended RFC status (None)
Formats
Expired & archived
pdf htmlized bibtex
Stream Stream state (No stream defined)
Consensus Boilerplate Unknown
RFC Editor Note (None)
IESG IESG state Expired
Telechat date
Responsible AD (None)
Send notices to (None)

This Internet-Draft is no longer active. A copy of the expired Internet-Draft can be found at
https://www.ietf.org/archive/id/draft-cuspdt-rtgwg-cu-separation-bng-deployment-02.txt

Abstract

This document describes the deployment model for a Broadband Network Gateway (BNG) device with Control Plane (CP) and User Plane(UP) separation. It is intended to give guidance for the deployment of CP and UP separated BNG devices in an operators' network.

Authors

Rong Gu (gurong_cmcc@outlook.com)
Sujun Hu (shujun_hu@outlook.com)
Zitao Wang (wangzitao@huawei.com)
Donald Eastlake (d3e3e3@gmail.com)
fangwei hu (hu.fangwei@zte.com.cn)

(Note: The e-mail addresses provided for the authors of this Internet-Draft may no longer be valid.)