Review request
draft-ietf-bess-bgp-vpls-control-flags

Request Review of draft-ietf-bess-bgp-vpls-control-flags
Requested rev. no specific revision (document currently at 08)
Type Last Call Review
Team Security Area Directorate (secdir)
Deadline 2019-04-01
Requested 2019-03-11
Other Reviews Rtgdir Last Call review of -06 by Acee Lindem (diff)
Opsdir Last Call review of -07 by Jouni Korhonen (diff)
Genart Last Call review of -07 by Meral Shirazipour (diff)
Review State Completed
Reviewer Watson Ladd
Review review-ietf-bess-bgp-vpls-control-flags-07-secdir-lc-ladd-2019-03-25
Posted at https://mailarchive.ietf.org/arch/msg/secdir/MtDojQMaB41uoW5Kv7EslG6aN4Y
Reviewed rev. 07 (document currently at 08)
Review result Ready
Draft last updated 2019-04-23
Review completed: 2019-03-25